Cranes pierce the skies below this fall, threatening a recession that will cripple construction sites. For the first time since the early 1990s, five towers of nearly 200 meters will rise simultaneously. Press We were lucky enough to rise to the top of three state-of-the-art structures.
Posted at 5:00 am
Martin Tremblay Press
Andre Dubuque Press
700, Saint-Jacques/Victoria in the Park
The result of the work of architects IBI and BLTA, the hybrid building, consisting of residences and offices, pierces Montreal’s skyline. Currently its construction is complete and the finishing phase has started. The 58-storey condominium tower with a total leasable area of 32,500 square meters sits on a 10-storey office podium.
Lives in upper Montreal
1/5
National Bank Tower
The only tower entirely dedicated to workspaces among Montreal’s new giants, the National Bank Tower is Montreal’s largest architectural work since the Olympic Stadium. From the fall of 2023, it will house the employees of the head office of the first Quebec bank.
There has been a change in the National Bank
1/5
Master Towers
Designed by Lemay Architects and built by Devimco Group, the 58- and 61-story Maesteria Twin Towers are connected to each other by a footbridge at 26.e floor, making it the highest walkway in a residential building ever built in Quebec. The set consists of 1743 houses and offers a basilire of commercial premises covering an area of 5000 square meters at street level.